REFURBISHED MAYCO ST30

Newly replaced Diesel Engine (Only 900 hrs/year 2012) This machine has been reconditioned, has all new wear parts, new piston cups, new electronic control valves, new hydraulic oil and filters, and newly fabricated fuel separator. This pump was Sandblasted and painted to factory standards, with new Stickers
30 Cubic yards/hr, 5″outlet, 800 PSI on face pressure.



Financing Available

More Information

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Full Description

Newly replaced Diesel Engine (Only 900 hrs/year 2012) This machine has been reconditioned, has all new wear parts, new piston cups, new electronic control valves, new hydraulic oil and filters, and newly fabricated fuel separator. This pump was Sandblasted and painted to factory standards, with new Stickers
30 Cubic yards/hr, 5″outlet, 800 PSI on face pressure.

5 Star Review

You dont need a new pump, you need JED Alliance!! Edward and his team at JED were outstanding! Edward got into the pits and helped get my pump ready for concrete in record time! Marcela in the office was always so kind, prompt and professional. They worked hard to provide a great product and experience. Our Putzmeister TK40 pump is on the job as we speak pumping like a dream. 10/10 recommend. When its time to purchase a back up, we are headed back to JED Alliance.

William Steinbach

5 Star Review

We found these guys online and saw some of their reviews, we decided to take a chance and buy a Putzmeister tk50 that was being refurbished, gave them a deposit and they called me when the unit was finished, so we decided to drive down ourselves. I just have to say that we were very impressed with their quality and attention to details, we love our pump and would definitively would do business again, thank you Edward and team

Chris Tarpley

0